top of page

Biomedical Innovation Centre

Location

 

 

Client

 

Functions

 

 

​

 

BUA

 

Service

 

 

Timeline

 

 

Partner​​

Suzhou

China​

 

Not Disclosed

 

Exhibition Centre

Offices

R&D Laboratories
Commerical Areas

 

127,000 sq m

 

Architectural Design

Landscape Design​

 

2021 Design

2025 Completion​

 

FTA Shanghai​

  Client's Requirements

  • Cutting-edge research facilities of international standard

  • 127,000 sq m above ground

  • Schematic design in 4 weeks + design development in 7 weeks 

​​​​​​​​​​

  Client's Goal​

  • Efficient, flexible and adaptable research space

  • Standardised construction for elevation and interior decoration

  • Reduced energy costs for cooling

  • Landmark building

​

  Our Solution with 75% of TFA Methodology

  • Unique building design by connecting buildings via bridges

  • Strong and minimalistic design with repeating elements

  • High degree of prefabrication and standardisation

   

  Our Results

  • 15% Savings on CapEx

  • 20% Savings on OpEx

  • 20% Savings on TTM

  • NUA/Gross Area = 82%

  • All design stages shortened by 25%

bottom of page