R&D Centre

Location

 

Client

​

Function

 

 

 

BUA

​

Service

 

 

Timeline

Shanghai​

​

Local Government

 

R&D Offices

Conference Areas

Exhibition Hall

​

21,700 sq m

 

Architectural Design

Interior Design (partly)

 

2011 Design

2016 Completion

  Client's Requirements

  • One office tower plus one conference and exhibition building

  • 21,7000 sq m above ground

  • Schematic design in 3 weeks + design development in 5 weeks 

​​

  Client's Goal​

  • Efficient, flexible and adaptable office space

  • Efficient and cost-saving construction methods​​​​​​​​​​

  • Reduced energy costs for cooling

  • Landmark building

 

  Our Solution with 70% of TFA Methodology

  • Unique building design as a result of the site's complex shape

  • Strong and minimalistic design

  • Optimised, simplified elevation with horizontal shading system

  • High degree of prefabrication and standardisation

   

  Our Results

  • 18% Savings on CapEx

  • 25% Savings on OpEx

  • 25% Savings on TTM

  • NUA/Gross Area = 78%

  • All design stages shortened by 35%